Depending on the type of Planning/implementation  it could be:

Work/Job in Process.

Work/Design Validation

Work /Design Pilot Validation

Product Realization

 

Aser Ahmad Ibrahim
par Aser Ahmad Ibrahim , Head of Planning and Purchasing Department , Sarrdesign

If you are referring to the marketing stage, it is the "introduction" stage.

Mohd Arifuddin
par Mohd Arifuddin , Lead Consultant , Binzagr CO

[Step 1] ConceptualizationGoal: think of something—a problem, a solution, a question, a gadget, anything that a product or service could address

[Step 2] Product/service definitionGoal: define project goals and general characteristics of a product(s) or service(s) based on market, customer, and user needs.

[Step 3] Product concept feasibilityGoal: begin to develop a concrete picture of what the new product or service will look like.

Step 4] Design and development, design verificationGoal: complete the design activity and verify the final product prototype against your established criteria (i.e., technical specifications). Proof-of-concept field testing and feasibility simulations may also be done at this stage.

[Step 5] Scale-up: design validation, transfer to pilot production, process validationGoal: validate the product or service design and manufacturing process.

Wasi Rahman Sheikh
par Wasi Rahman Sheikh , WAREHOUSE SUPERVISOR , AL MUTLAQ FURNITURE MFG

I will be wait experts answer <<<<<<<<<<

Rami Assaf
par Rami Assaf , loading and Storage Operations Supervisor , Arab Potash Company

Thanks for invitation

 

I am agree with my colleague’s answer my Mr Arifuddin he gives us good answers

Ahmed Mohamed Ayesh Sarkhi
par Ahmed Mohamed Ayesh Sarkhi , Shared Services Supervisor , Saudi Musheera Co. Ltd.

agree with all expert answers above

 

Hachimi Benazouz
par Hachimi Benazouz , TECHNICIEN EN MAINTENANCE TECHNICIEN EN CONTROL DE QUALIT2 E , BCR

After taking Uyaynah of new material and studied in the laboratory in all respects ask the Director-General entered into force by agreeing with the internal auditor of the institution and the first official surveillance, taking into account the customer orders