Hi,

 

Return bends are mandatory to provide to avoid accumulation of sediments in the drop nipple except in these below cases:

  • Deluge sprinkler system
  • Dry sprinkler system
  • And the sprinkler with K value 11.2 or more.

mahmoud elshinnawi
par mahmoud elshinnawi , Lead Mechanical Engineer – Site Based , ASAS Electromechanical contractors

The obligation depends on the local authority, or the standard followed in the region. If the system is a dry type, no need for the return bend.

Satej Jaokar
par Satej Jaokar , Mechanical QC Enginner , Saudi Oger Ltd

Yes, Not required in deluge system & dry pendant sprinlers. Will be given consideration if using potable water, depends on approval authority.

jay vargas
par jay vargas , Plumber , 2014 Saudi Archirodon Ltd

yes. because the purpose of return bend is to stop the smells to come back.it is nessesary to use it.

Mohammed Shebl
par Mohammed Shebl , Contract and Commercial Manager , China Railway Construction co.ltd

according code , if we use pure water from tank we will not need to put return bend , because  the purpose of a return bend is to prevent the accumulation of sediment in the pipe drop to a fire sprinkler 

Zaid Al Shurafa
par Zaid Al Shurafa , Mechanical Project Engineer , Amana Contracting And Steel Buildings - DUBOX

I have checked the NFPA 13 code , and I found that we can ignore it if we have 11 K-factor or above for sprinklers , otherwise we must use return bend .But is saudi arabia I saw many project they ignore it , Although they use sprinklers with 5.6 K-factor !!

mohammed ateeq
par mohammed ateeq , Electrical draughtsman , Electrical draughtsman

as per consultant request intragroup

Firozalam Siddiqui
par Firozalam Siddiqui , SENIOR ELECTRICAL ENGINEER , DAR AL RIYADH

Yes, considering site condition, it can be provided and acceptable. In case it can be avoid or ignored as per K factor's value.

gouse peer syed
par gouse peer syed , Site & Maintenance Engineer , Arab air conditioning & refrigeration.co

No problem, we can take return bend before the sprinkler. but need to follow the design specification as per site requirement. we need to check flow rate & pressure.