Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
7 to 9 PKR per unit is expected price of Coal based power plants generated power. The major portion of cost is the capital cost Return.
The Per Unit cost from Upcoming CFB projects will be around 6 to 8 PKR. These boilers will operate on High pressure resulting lower cost per unit. However the maintenance cost of CFB boilers is quite High.