Which of the following are tool/ technique of Perform Quality Control that involves measuring or testing results to determine whether they?

 confirm to the requirements and quality standards?

A. Pareto diagram

B. Control charts

C. Monitoring

user-image
Question ajoutée par Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
Date de publication: 2016/06/15
Eng Ahmed Elsharkawy
par Eng Ahmed Elsharkawy , Civil Engineering Project Manager , Altwijry office

thanks for invition ,,,,,,,,,, my choice is option B

Imran Sayed
par Imran Sayed , Vice President , Goldman Sachs

The answer is Control charts

Sathish Prabhu.V
par Sathish Prabhu.V , Manager - Operations & Process Improvement , Revolution Valves

Control chart enusures quality control of the product

Ksenija Kancelak
par Ksenija Kancelak , Construction Project Manager , City of Koprivnica, Koprivnica (Croatia)

My oppinion is that the answer is:

B. Control charts

Utilisateur supprimé
par Utilisateur supprimé

Correct answer is 

B. Control charts

Agree with Mr  Usman Islam

Usman Islam
par Usman Islam , Logistics And Warehouse Manager , Kirtanlal Scaffolding & Formwork

Option B control chart is correct

Ramzi SAMRI
par Ramzi SAMRI , Industrial engineer , Institut für Betriebliche Bildungsforschung Berlin (IBBF)

Thanks for the invitation, control charts is the answer.

mamoun mokhtar
par mamoun mokhtar , general manager , albyan technical foungary

thanks for the invitation , now measuring is done during the process of production but testing is done for the final product iwill give an example as a battery of1.5 volt , during the process of production i will measure the size of bobbin and can and paste quantity and these are sub-assemblies of the battery but when the product is complete i .e complete battery then i will test the battery for low volts, both are tools for quality assurance but at different stages

mazin marouf
par mazin marouf , Quality Assurance Auditor (IRCA certified QMS auditor) , Safat Aviation Group

to determine wthether they confirm to the requirements and quality standards you use (Control charts)