Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
confirm to the requirements and quality standards?
A. Pareto diagram
B. Control charts
C. Monitoring
thanks for invition ,,,,,,,,,, my choice is option B
The answer is Control charts
Control chart enusures quality control of the product
My oppinion is that the answer is:
B. Control charts
Thanks for the invitation, control charts is the answer.
thanks for the invitation , now measuring is done during the process of production but testing is done for the final product iwill give an example as a battery of1.5 volt , during the process of production i will measure the size of bobbin and can and paste quantity and these are sub-assemblies of the battery but when the product is complete i .e complete battery then i will test the battery for low volts, both are tools for quality assurance but at different stages
to determine wthether they confirm to the requirements and quality standards you use (Control charts)