Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
By registering the most repetitive occurred risks related to operations & industry.
Risk register provide risk profile of each area and suggestions to mitigate them. If someone wants to have quick over view of the set of controls in place and their effectiveness at a given point in time, risk register can help him a lot in no time. Further, review as to how existing controls have weaken over a given period of time can be done from this document. Further, strategies for reinforcement of controls can be devised that would help in reducing risks.
The past records of Risks give information on similar type of work place or method to implement appropriate control measures to eliminate the risk and achieve a ZERO accident work environment
Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?