Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

How much steel is required for 1 cum concrete?

user-image
Question ajoutée par khan pathan
Date de publication: 2016/08/27
Basheer Nazmi
par Basheer Nazmi , Tornado General Contracting and Maintenance

depend on the element but mostly (100kg to 160 kg )

Imran Ahmed
par Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

It varies from project to project even from element to element depending upon the structural calculations manually or by softsware based on different Codes like ACI, BSI etc.

As thumb rule, it is estimated as below in normal case.

1) In Fotting  = 1 to 2 %

2) In Beam   = 1.5 to 2.5 %

3) In Column = 2 to 3 %

4) a) In Slab( Single Mesh) = 0.75 to 1.5%

    b) In slab (Double Mesh) = 1.5 to 3 %

This is only for quick and rough estimate. For accuracy, it need calculation and bar bending schedule.

 

 

 

More Questions Like This