Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
A. A prime cost.
B. A period cost.
C. A product cost.
D. Both a product cost and a prime cost.
D. Both a product cost and a prime cost describes direct labor.
Both a product cost and a prime cost..........................................................
A is the correct answer.
Direct labor cost is a part of wage-bill or payroll that can be specifically and consistently assigned to or associated with the manufacture of a product, a particular work order, or provision of a service.