Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
A. The various management plans of the project B. Schedule baseline and cost baseline C. Product configuration ID and statement of work D. WBS dictionary, WBS, scope statement
not every one must know about emergency escape route
I agree with Option-D.................................................................
Yes it is D) .
Thanks for the invite.
Option D is most appropriate.
Thanks for your invitation. Option D.
Thanks for the invite ............................d
this answer is taken from internet search for verification of questioner
The scope baseline consists of all of the documents except:A. Work Breakdown Structure B. W.B.S Dictionary C. Scope Management Plan D. Scope Statement
Many people get mistaken about the W.B.S and the W.B.S dictionary. They think that these are quite detailed documents that are developed much later in the project life cycle. So at least one of these documents is not part of the scope baseline. The problem stems from their lack of experience in creating a formal scope baseline in their projects.
Actually, both W.B.S and the W.B.S Dictionary are part of the scope baseline, as well as the Scope Statement. So by the method of elimination, we arrive at the correct answer of C – Scope Management Plan.
option (D) seems to be the correct answer
My answer is for option (D)
Option D is the closest answer