Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the purpose of control limits?

A.  Identifying “rule of seven” patterns in control charts. B.  Increasing process quality from3σ to6σ.  C.  Specifying the range of acceptable results.  D.  Identifying whether the process is in control or not.

user-image
Question added by DR MD ANWAR HOSSAIN , Moderator , bayt.com
Date Posted: 2016/10/13
FYAIZ MUSTAFA
by FYAIZ MUSTAFA , Duty Manager Operations Control , BAYVIEW EDEN

My option is D brother. Thx for your invitation

 

Ghania MESSAOUDI
by Ghania MESSAOUDI , consultante , kaizen conseil et formation

I GESS THE ANSWER IS OPTION D AS MENTIONNED BELOW

Muhammad Farooq
by Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

I will go for option D    ----------------------------------

MOHAMMAD MAHMOUD HASAN AL-HASHASH
by MOHAMMAD MAHMOUD HASAN AL-HASHASH , مدير صيانه , شركة الاستراتيجي للتجاره

the correct answer is D

 

regards

AISSA OULED HADJ BRAHIM
by AISSA OULED HADJ BRAHIM , رئيس مشروع , ُEco S est

 l'objectif de la limite du contrôle est de permettre au gestionnaire d’atteindre son objective avec l'option  D

Deleted user
by Deleted user

Thank you for your invitation

Option-D

Taha Mustahsan
by Taha Mustahsan , Project Engineer (Distribution) , Sui Northern Gas Pipelines Ltd

D option... in my opinion is the right option

Imran Ahmed
by Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

Option-D.......................,,,,,,,,,,,,,,,,,,,,,,,,,,,,.........................

Mohammed Asim Nehal
by Mohammed Asim Nehal , M Asim Nehal & Co , Chartered Accountants

 

D.  Identifying whether the process is in control or not.

 

Deleted user
by Deleted user

option (D) is the correct answer

More Questions Like This