What is the first step in a control process?

 

a) Allocate resources

 

b) Choose key personnel for the task

 

c) Select a strategy

 

d) Set standards

user-image
Question ajoutée par DR MD ANWAR HOSSAIN , Moderator , bayt.com
Date de publication: 2016/10/20
MOHAMMAD MAHMOUD HASAN AL-HASHASH
par MOHAMMAD MAHMOUD HASAN AL-HASHASH , مدير صيانه , شركة الاستراتيجي للتجاره

the answer is D  

 

regards

Option 'D'  Setting Performance standards; that is Quantitative Standards (Revenue, Units, Cost, Time and Amount) and Qualitative Standards (Improving Motivation level of employees;  Labour relations; Quality and Improvement)

 

Utilisateur supprimé
par Utilisateur supprimé

Thank you for the invitation

<<<<<<<<<<<<<<<<

d) Set standards

adel rashik abbas sedki
par adel rashik abbas sedki , مدير المكتب الفني , جهاز مدينة القاهرة الجديدة

 set Standards  my Choice is Option D

Standards are criteria against which results are measured. They are norms to achieve the goals. Standards are usually measured in terms of output.

أحمد حمدي الزواوى
par أحمد حمدي الزواوى , Project Manager,Projects Manager , M.A.ALSOBHI COMPANY

My answer is D

 

Thanks for the invitation

Utilisateur supprimé
par Utilisateur supprimé

option (d) is the correct answer

Muhammad Farooq
par Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

Standard should be the priority--- Option D

Sattar Abdulkarim  Mohamed
par Sattar Abdulkarim Mohamed , Country Sales Director , Ideal Technical Solutions

Thanks for a lot of invitations. Option D - Set Standards.

mamoun mokhtar
par mamoun mokhtar , general manager , albyan technical foungary

every thing you choose should have standard so i think it is the priority

Md Fazlur Rahman
par Md Fazlur Rahman , Procurement Specialist , Engineering and Planning Consultants Ltd

My Choice is Option  D( Set Standards)

Any control process needs a baseline /set of standards.

For Human control it is Job description and HR manual.

For product quality control, the requirement is correct specification.

For operational control, it is the set of parameters how the operation shall be performed and so on