Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
A. risk assumption
B. risk assignment
C. risk delegation
D. risk deflection
E. risk mitigation
option (D) is the correct option
Thank you for the invitation. My answer is D
_______________option (D) is the correct option
__________
My answer is for option (D)
Option D - Risk Deflection. Thanks for your invitation.
Transferring or Deflection by sort of a contract. Option D
the correct answer is D. risk deflection
Even though, it might be risk control as in giving a specialist what he can do better than us.
In the absence of Risk Transfer option , I will go with option D - risk deflection.
E. RISK MITIGATION
this could be a right answer because assigning part of work means we are mitigating
Answer is A - because is a matter of assume the responsibility of:
1. choosing a contractor
2. taking a risk that the contractor can deliver that part of the project
3. assume the risk and the possible consequences that comes with the decision of delegate the part of project
I seem D option is appropriate answer.