Changes are generally not predictable, therefore planning for change management cannot be reasonable التغييرات عموماً تكون غير متوقعة، وبالتالي فالتخط
Planning for change management should be done while the various change control processes are being applied التخطيط لإدارة التغيير يجب أن يتم أثناء تطب
Change management can be planned in a set of management plans or a specific change management plan يمكن التخطيط لإدارة التغيير في مجموعة من خطط الإدار
Changes are a sign of poor planning. One should avoid changes during a project, thus eliminating the need to manage them التغييرات هي علامة على سوء ال
International trainer ENG . Hassan Shalaby
My answer is for the second option -- Planning for change management should be done while the various change control processes are being applied
Planning for change management should be done while the various change control processes are being applied to reflect specific change needs in all ideal change management situations.
Thanks for the invitation. I agree with your explanation.
Change management can be planned in a set of management plans or a specific change management plan
I will go with option C and thanks for the invitation.
Thanks for invitation
second option