A stakeholder came to you, the project manager, and suggests a change that will shorten your schedule by 2 weeks. What is the first thing you do?

تقدم أحد المعنيين لك، مدير المشروع، باقتراح تغييرسوف سيختصر الجدول الزمني الخاص بمشروعك بمقدار أسبوعين. ما هو أول شيء يجب عليك القيام به؟

Write up a change request and see if you can get it approved أكتب طلب التغيير، ونرى ما اذا كان يمكنك الحصول على موافقة عليه

Make the change; it will save time and no one will want the project to take longer time نفذ التغيير؛ فهو سيوفر الوقت و لا أحد يريد أن يستغرق المشروع و

Figure out the impact on the scope of the work and the cost before you write up the change request اكتشاف تأثير ذلك على نطاق العمل والتكلفة قبل أن تكت

Tell the stakeholder that you’ve already communicated the deadline for the project, so you can’t make any change now أخبر الشخص المعني أنك قد أبلغت با

 

 

 

International trainer ENG . Hassan Shalaby

 

user-image
Question ajoutée par hassan shalaby , اخصائي تسويق ومبيعات، ومدرب مهارات معتمد من جامعة نوتنجهام بالمملكة المتحدة وجامعة عين شمس بالقاهرة , Galal Al , Sharif _Trading
Date de publication: 2017/01/03
adel rashik abbas sedki
par adel rashik abbas sedki , مدير المكتب الفني , جهاز مدينة القاهرة الجديدة

  c is the right answer due to must study impact on the scope of the work and the coast

senthilrajan muthiah
par senthilrajan muthiah , Sr. HSE OFFICER , URC CONSTRUCTIONS PVT LTD

I thank the stakeholder and utilize the two weeks in training and development

NUR-AINA NURON
par NUR-AINA NURON , EXECUTIVE ASSISTANT TO THE GENERAL MANAGER (ACCOUNTS MANAGER) , QATAR HAIR CENTRE

A suggestion can be considered if it implies possible good results. So the very first step to me would be, going through the proposed changes and balance the proposals positivity on the ongoing project. You can be open to an idea and adopting it isn't too hard to do, executing it is where you get the real challenge. So just be wise and honest. If its too risky its always good to show a visual view of ideas to the stakeholders, as they make their decisions through their visions otherwise take the risk but be sure to be ready of taking responsibilty to what awaits.

DR MD ANWAR HOSSAIN
par DR MD ANWAR HOSSAIN , Moderator , bayt.com

Thank you for invitation & necessary information.

Utilisateur supprimé
par Utilisateur supprimé

Take some time , get into detail , Accommodate the change inform stakeholders.

Say thanks to stakeholder who gave this idea.

Utilisateur supprimé
par Utilisateur supprimé

In my opinion it is the 3rdd option

Muhammad Farooq
par Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

i think option#3 is better choice

Krishna   KHASANIS  PMP
par Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

I think option C is the most appropriate and thanks for the invitation.

hisham abu dagga
par hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thanks for invitation

option c

Abdul Rehman
par Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. I would like to choose third option as my answer

Utilisateur supprimé
par Utilisateur supprimé

Thanks for the invitation however im agree my colleagues answer which is option C