Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
A. Attempts to reduce resource requirements within a constraint on project duration
B. Smoothes out resource requirements by rescheduling activities within their float time.
C. Allocates resources to activities to find shortest schedule within fixed resource limits.
D. Smooths out resource requirements by substituting activities with unassigned resources.
E.1) Smoothes out resource requirements by rescheduling activities within their float time, or2) Attempts to reduce resource requirements within a constraint on project duration
As the main aim of resource leveling is to allocate resource efficiently, so that the project can be completed in the given time period. I think it will be great to find shorted schedule within fixed resources.
Option C will be correct answer
we plan to adjust time schedule with resource of projects,mainly at first step we use floating times to reduce and blance resources, and in advanced stages we suggest some durations in time schedule to create floating times for an activity.
Answer E is optimum answer with 2 option flexibility
Smoothes out resource requirements by rescheduling activities within their float time
My answer Option: A (Attempts to reduce resource requirements within a constraint on project duration.
i think we have to play on activity scheduling option b
Resource Leveling is a technique in which start and finish dates are adjusted baced on resource constraints with the goal of balancing demand for resources with the available supply.
i believe E is closest to the correct answer.