Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
It is the fall of the concrete which will provoke the segregation of the components, so it is preferable to take precautions for this type of activity, for example to provide an addition hose in such way to decrease the height of the fall (should not exceed 1.5 m) , also to ensuring the waterproof of the formwork to avoid the loss of laitance .
- Concrete Consolidation
- Pouring Concrete height, not more than 1.3
- Poor Concrete Workability due to improper W/C Ratio
- Over size Aggregate
-
- Concrete Consolidation
- Concrete Bleeding.
- Concrete Setting Time.
Honeycombs are hollow spaces and cavities left in concrete mass on surface or inside the concretemass ... Honeycomb is due to non-reaching of concrete to all places due to which cavities and hallow pockets are created, main reasons are:.
Missing: height 6m