Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is the minimum distance requirement between the Production Data Centre Facility and Business Continuity Disaster Recovery Site?

In case of a disaster due  Flood | Fire | Fiber Cut / Loss of Network | Power Failure |False Redundancy | Human Error | Earthquake | Hacking / Malicious Code | Data Corruption / Loss | Cascading Systems Failure how sooner could you ensure business continuity and Data Loss prevention with perfect Data Integrity.

user-image
Question ajoutée par Jayson Rodrigues , Senior IT Infrastructure & Data Center Operations , UNION NATIONAL BANK (UNB) - Head Office
Date de publication: 2017/02/08
Zainab Idris Muhammad
par Zainab Idris Muhammad , Arabic Teacher/Administration Officer , Sa'adatu Rimi College Of Education Kano State,Nigeria.

Data Integrity is a way of professional people to prevent Information and An Authorised Things.

P Shankaran
par P Shankaran , Principle Consultant , SMCE

Depends upon business requirement, ideally it can be 50 Miles. More far from primary its better.

Abul Aurs
par Abul Aurs , IT Operations Lead , Imdad uae co llc

It is better to be 150 KM and provided that you do risk analysis by considering the geo location and nature issues on the location of your data centers

Ali Sadieh
par Ali Sadieh , Senior Solutions Consultant - Infrastructure , International Turnkey Systems

There have been organizations that preach a 50 mile minimum is an acceptable distance.  There are others that have also concluded that at a minimum there are factors that can minimize the impact to either facility including, separate power grids, water supplies, central offices etc.  Estimates of reasonable distances range from 10 miles in the US, 15 kilometers in Canada and 8 miles in the UK.  However, there is no accurate number of such distance so far.

It depends on the Business Vision and Management. Mission is to get Business keeping running and your customers see significant value in our service provided to them. But Above all, Telecommunications and Data Links play a very dominant role in Business Continuity. Even after disaster recovery, establishing networks by Telecoms will face challenge and that can be a real test for business. Types / Modes of Telecommunication put into business can be Worked out to effectively face Disaster Situations and thus managing business continuity. 

Khaled Altawily
par Khaled Altawily , Director Business Continuity & Crisis Managament , Alrajhi Bank

I'm not aware about any recommended distention, I remember that I've read somewhere in the internet that 30km is fear distance but not sure if this was mentioned in ISO or any other best practices.

 

In my opinion, it is totally depends on your budget. You may have your DRC in a different city or even different country (if you located in European continent, you may have your DRC somewhere in Africa) but this if you have sufficient budget and you may go with cloud services and replications which is the best solution but most expensive. 

 

Also, you must consider that long distention may save your data from natural disasters such as flood or earthquake, etc... but you need to consider how long you will take to move the team there unless you have different team to operate from the DRC. 

Mamuzo Asiemo
par Mamuzo Asiemo , System Support Engineer , Diamond Bank Plc

My sugesstion is that, It should be 800 to 1,000 miles. Because too far can be risky as distance doesnt really mean safety.

Mostafa Mohamed Abdulhasib Tolba TOLBA
par Mostafa Mohamed Abdulhasib Tolba TOLBA , فني تمريض وطواريء طبيه عاجله , الصناعات الهندسيه الثقيله وبناء السفن

five kilometers

خمس كيلومتر

Iqbal K T
par Iqbal K T , Technical Account Manager , Hewlett Packard Enterprise - India

It is depends on the buisiness requirement, Idel is production will be in the same site and DR will be in  other location (Anywhere) with proper communication

Dennis Omenka
par Dennis Omenka , Process Engineer , FHN 26 Ltd

I think is business objective dependent.

Vincent Odhiambo
par Vincent Odhiambo , teaching assistant , n/b

it requires about two hundred metres

More Questions Like This