Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is the meaning of mark-up a line with red flag. These drawings for steel structures ( pipeline racks)?

user-image
Question ajoutée par Negad Zaki , Senior Lifting Engineer , velosi
Date de publication: 2017/03/20
Jose Malacura
par Jose Malacura , Project Manager , FF CRUZ & CO. INC

§  Prepare Shop Drawing (SD) for structural drawings, architectural drawings and mechanical isometric drawings.

§  Prepare coordination shop drawing (CSD)

§  Prepare Request for Information (RFI) for any changes and revision of the plans related to Architectural, Civil and Structural.

More Questions Like This