Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are the steps in setting up a cost-per-activity system?

user-image
Question ajoutée par Nadjib RABAHI , Freelancer , My own account
Date de publication: 2017/03/26
MOHAMMED ELATTAR
par MOHAMMED ELATTAR , مدير مالي , TAZWEED FOR AGRICULTURE CROPS

Thanks for the invitationagree with mr . soliman

Frank Mwansa
par Frank Mwansa , ACCOUNTING LECTURER , FREELANCER

1. Identify the main activities in the organization eg materials handling 

2. Identify the factors which determine the costs of an activity (cost driver)

3. Collect the cost of each activity (cost pools)

4.charge support overheads to products on the basis of their usage of the activity.

Soliman Abd  ALmalak Gendy
par Soliman Abd ALmalak Gendy , مدير ادارة مراقبة حسابات , الجهاز المركزى للمحاسبات

Activity_based costing is more refined approach to costing product than traditional costing method. _It involves: *Classification of each activity accounting to the cost hierarchy *Identification and accumulation of total cost s of reach activity *Identification of activities involved in the production process *Calculation of of total units of the cost driver for each activity *Calculation of the activity rate *Application of the cost of each activity to products based on activity usage by the product

More Questions Like This