Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are change request types ?

user-image
Question ajoutée par Javad Taghavi , Program Manager, Senior Adviser in Project Management , KCE Co.
Date de publication: 2017/04/14
Utilisateur supprimé
par Utilisateur supprimé

Change request types are normally any request that has been put through the helpdesk or any other means of placing a request, that generally ask for information or pre-authorized requests for an example( stationary, printer cartridges), a moving of a pc from one desk to another, replacing a faulty mouse ..... 

These are normally things that have no or very little impact on the business operations.

Fraz Ali
par Fraz Ali , HSE Engineer , AAA Partnership Pvt. Ltd.

Many times, a construction project requires some changes such as addition, deletion or modification of works, or can be changes in local laws related to construction works. These changes can be done by owners, contractors, architects, designers etc. at a later date after signing of the construction contract. These changes are incorporated in construction contracts through a written change orders.

Common types of change order Common reasons and sources of change order Change in scope of project Tenant agency has requested a design change Unforeseen conditions Site conditions differ from the expected. Changes required by professionals or contractor Professional errors and omissions Requested by contractor or professionals Errors Errors in construction design plans and specifications Omissions Omission of an item or element from the plan

teresah njoki
par teresah njoki , RECEPTIONIST , Hilton Hotels World Wide

 

change request is a document containing a call for an adjustment of a system; it is of great importance in the change management process.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?