How to prevent blocking of railway turnouts due to the wind of the desert ?

user-image
Question ajoutée par Claudio Cattaneo , Technical Director and Legal Representetive , Ing. Cattaneo & C. s.r.l.
Date de publication: 2013/10/09
Sam Lund
par Sam Lund , Management consultant , Stella Polaris

Basically the deal is the same as in the Nordics due to snow and ice - i.e. clean them up (with dedicated cleaning units), and build protective surfaces/barriers in the particularily exposed areas.

Claudio Cattaneo
par Claudio Cattaneo , Technical Director and Legal Representetive , Ing. Cattaneo & C. s.r.l.

For ice and snow it is much easier to the prevent blocking of railway turnouts ;

for exampleeven more effective : in theSecond World War British motorcycles could not work in the desert ( it'shistory ) , the Italian and German instead never stopped .

The sliding mechanismof railway tournouts ( whichmust be greasedfrequently ) attractthe desert sand like flies on shit

Ismail RAMDANE
par Ismail RAMDANE , Project , Algiers

Hi;

There is only periodic maintenance,

There is an other phenomenon, sand deposit can be solid after raining ...in this case we need strong washing of components and mobilized pieces.

 

mohammed el byari
par mohammed el byari , عامل مؤهل , rema auto, Tizi

ONCF   MEKNAS- National Office for railways- Mechanical engineer                

CEIT  CAZABLANKA –National office for railways- Mechanical Engineer                       7Feb2011

 

ONCF –National Office of railways –Certified Mechanical Engineer     17Oct2012-16Jan2013