Question ajoutée par Mahmoud alsouqi , Sr Project Engineer , DAR WA EMAAR DEVELOPMENT AND REAL STATE
Date de publication: 2017/04/30
يوسف دمدوم
par يوسف دمدوم , مهندس و مسير , مقاولة اشغال البناء

Thank you for the invitation

to be a concrete sample test several times so we can see the resistance to pressure and be on the second day of pouring concrete, third, seventh and fourteenth and twenty one twenty-eighth to reach maximum resistance

Engshams Civil
par Engshams Civil , مهندس مدني عام , مكتب هندسي

This test is used after the failure of the results of the examination of compressive strength of 28-day concrete samples, after which the hammer test is used, the results of which are inaccurate and can be considered as a predictor for the results of our core test

hisham abu dagga
par hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Thank you for the invitation

Agreed with colleagues

With greetings and appreciation

Muhammad Farooq
par Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

when concrete cylinders (Average of three) did not achieve required concrete compressive strength then cores are taken(Average of three) and shall be min 85% of reuired concrete strength. The individual shall not be less than 75% of reuired concrete strength.

Murat ÖZ
par Murat ÖZ , Construction Superintendent (Electrical) , Al EZZA

Since 09:30 to until  12:30