There are a number of different steps but the five I would choice are

  1. Define the work packages with a WBS,
  2. Work out the dependencies between these packages,
  3. Work out the duration of each package,
  4. Complete the critical path analysis,
  5. Resource load the plan and optimize to meet the success criteria. A paragraph on each of these should pass.