Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

How do you can control the cost of any construction activity simply?

user-image
Question ajoutée par ahmed saadani , Civil Construction Manager , Al-Ghanim International company
Date de publication: 2017/07/23
Karage gowda
par Karage gowda , Talrak Construction Chemicals Pvt, Ltd., , Fosroc Chemicals India limited

Instude of using more cement in the construction, use new construction chemicals like  PC based admixture /flyash/ GGBS/ using low cost sand/ using fibres in the plastring and redusing the thickness of plasting. fixing the tiles dont use the cent morter, in the same place use tile adhesives cost will reduces.

Pawan Saxena
par Pawan Saxena , Asst. Manager –Contract and Procurement (High & Low Rise Bldg.) , Alpha Corp Development Private Limited

Simplest way are Value Engineering and fair negotiation with Contractor/Supplier for control the cost of construction activity 

Wilson Keerikkunnel
par Wilson Keerikkunnel , Head , Info Tech

The cost plan should, include the best possible estimate of the cash flow 

for the project and should also set targets for future running costs. 

The cost plan should cover all stages of the project and will be the 

essential reference against which the project costs are managed.

 

The method used to determine the budget will vary at different stages of the project, 

although the degree of certainty should increase as project elements become better 

defined. The budget should be based on the client’s business case and should change 

only if the business case changes. The aim of cost control is to produce the best 

possible building within the budget

 

The cost plan provides the basis for a cash flow plan, allocating expenditure and 

income to each period of the client’s financial year. The expenditures should be 

given at a stated base-date level and at out-turn levels based upon a stated 

forecast of inflation.

Erwin Garing
par Erwin Garing , Technical Clerk , Ali & Sons Contracting Company - Sole Proprietorship

Any activity at the site have equivalent cost, but we can control it in different ways

* Avoid delays (One of the factors that have a great impact) using proper time management and framework

* "Do it now" impression -  waiting is cost

* Ask further instruction if it is not clear. Asking question is not necessarily mean that you understand it. "Better sure than sorry"

 

More Questions Like This