Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
Pre-pouring concrete inspection means before and during concrete pouring we have to check weather all related descpline already ok and approved from the consultant or client Ex- earthwork , form-work, electrical , mechanical , steel reinforcment etc.
And Post-concrete inspection is for the purpose to check the defects in formwork , concrete casted honeycomb , shrinkage etc and steel reinforcment weather its exposed or not .accuracy of dimentions etc