Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

When items to be purchased for a project are specified by performance characteristics?

 A. Both1) the supplier is held liable for the operation of the item, and2) the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.

B. the supplier is held liable for the operation of the item C. the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.

D. the supplier is held liable for the maintenance of the item

E. paperwork is greatly reduced

user-image
Question ajoutée par Muhammad Farooq , QA-QC Manager , AL Bawani Contracting Co
Date de publication: 2017/12/07
Muhammad Farooq
par Muhammad Farooq , QA-QC Manager , AL Bawani Contracting Co

B. the supplier is held liable for the operation of the item C. the supplier is held liable for that the item meets the design, dimensions, and tolerance specifications.

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?