Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
a -10 months b -12 -14 months c - More than16 months
More than16 months
C-More than16 months
Depends on many things but mainly on the availability of resources and a clear and defined scope of works.
Depends on a lot of things, but for a medium sized building (footprint600 to8000 meters): foundation ( no parking layers)2 months, try to design a construction type for1 floor per week, so that sets a goal for the team every week.
I think for50 floors building it takes more than16 months
The timing for delivery will be governed by the following;
Why?
Where?
By who and how much ?
one floor per week-two years total subject to the competency of construction manager and general forman