Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
As the question is not specific to any trade, I would say that centralized contracting is always the better choice as it provides more control on various trading items as well as reducing wastage by maximizing the use of the material on different locations and of course operation cost will be limited to one place only.
Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?