Successful handing over of each contractors, clearing all snag lists. Commissioning of project only after inspection of all the activities specified in the Construction Program.
1- approved shop drawings to be strictly followed.
2-strict safety measures to be followed on ste
3- specifications to be followed.
4- test results must be satisfactory
5-maximum points of snag list should be cleared .
5- planned program to be followed for energising
6- planned commissionoing of substation equiplments with the presence of government or client representative according to the authority rules and regulation.
Must have good communication with the client and team members. See to it that all information and required documentation are intact not to limit the corrective actions with the snags, test data, materials, operating spare parts, and test equipment required by the projects. Proper communication and close coordination will solve all project issues effectively and efficiently.
Completing a Technical project is carried out by doing the following activities.
1. Installation work as per Project spec, Snag list to be attended approved by client & consultant.
2. Preparing Method statement for Pre Commissioning & Commissioning Activities
3. SAT procedure for testing
4. MOM as per the commissioning procedure to be completed and duly signed by each party.
Mix of planning, monitoring, and controlling can make the difference in completing a project on time, on budget, and with high quality results.