A. Omit problems from the conference report. B. Ensure that changes to the project character are reflected in the definition. C. Verify the project schedule is on track. D. Define causes and symptoms of identified problems. E. Conduct periodic inspections, reviews, and walk-throughs.
To set up a methodology that establishes the project's timeline, goals, and how to allocate resources.
Does not necessarily mean that the project is going well if meets the scope, to comply them but very elongated in time produces lost to the project, it is necessary to revise the labor force, and supervisor, run-times and the quality of the executed works, so that they do not produce re works that impact reaches in time and costs
After detail estimating including overhead within the scheduled time frame it is to be checked that the expected Profit can be achieved.
Verify the project schedule is on track
B. Ensure that changes to the project character are reflected in the definition. Change orders or variation order or site instruction become the part of scope. So that should be tracked down carefully.
The correct stakeholders from the organisation commissioning the project must be involved very intimately at various stages of the project scope. When this does not occur, assumptions begin to be made (which are generally subjective) and stakeholder confusion can occur as the project goes on
The scope of the project consists of all the activities that are used (resources, human beings, funds), including quality standards, and includes
The goals of the legislator
Project limits
Project limitations
E. Conduct periodic inspections, reviews, and walk-throughs.