Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
For small and medium size equipments in pipeline (like valves),concrete foundation is precasted in shop then transferred to put in place on which the valve should be installed.
For larger equipment (like pig lounchers,large valves and so on), concrete should be poured on to the foudation formwork provided with reinforcment.It is cast in-situ concrete or cast in place concrete.