Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are the parameters should we consider in production planning of assembly lines?

user-image
Question ajoutée par Amandeep Singh Ashu , Assistant Manager , mahindra & mahindra swaraj division
Date de publication: 2013/11/15
Utilisateur supprimé
par Utilisateur supprimé

You need to know the overall production strategy, is it demand based (pull) or operation in full capacity, after that, you will know final output number, availability of production lines, and WIP buffers needed, which determines the output of each assembly line.

After this high level planning, you need to get into the details of people operating each machine (their skills and availability), probably would tackle shifts if in mass production, raw materials needed, and tools required (if not fully automated lines).

munir mohsin
par munir mohsin , Managing Director , Pakistan Ordnance Factories

Production Planning of assembly line would essentially following parameters known.

1.Annual targets.(Supplies to made )

2.Designed Production Capacity

3.Optimum Production Capacity

4.Budget

5.Supply Schedule

6.Operations Layout

7.Procurement Planning Schedule of materials,equipment.

 

These factors are important for production planning department to develop planning strategy of a production assembly line.In addition  liaison with production department,inventory and stores department is very important.Most essential is JIT approach to avoid any hold up of production.

 

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?