Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
The baseline is the original range, total cost and schedule of a project.
It is used to measure the amount of deviation of performance from the original plan. Before, the execution of the project, the baseline must be properly defined and documented.