Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

Arrange your prorities at site quality, cost or time for execution at site?

user-image
Question ajoutée par Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company
Date de publication: 2013/12/31
Bijoy  Baby
par Bijoy Baby , Project Manager , Alumayer India Pvt. Ltd.

Quality in the sense of a project is the out come of its maximum perfection in a specified timeline...means...less error will produce no rework, no extra time, no wastage, no extra coast..that is the beauty of a controlled project. The error is depends of the way you done it. 

Ahmed Mamdouh Kamal
par Ahmed Mamdouh Kamal , Founder & Product Designer , AMZ Guitars

The triple constriant of a project is dependent on the type of product/service we provide. So, there is no general answer to this question.

Sohaib Ashraf
par Sohaib Ashraf , Resident Engineer , Meinhardt Pakistan pvt LTD

1. Time

2. Quality

3. Cost

Abrar Hussain
par Abrar Hussain , Contract Manager , Sahara Tamiratt

1. time

2.quality.

3.cost

Ali Abadi Rasool
par Ali Abadi Rasool , Consultant Electrical Engineer , Many Private sector and government companies

a) Quality

b) Time

c) Cost

Ramesh Venkat
par Ramesh Venkat , Chief Executive Officer , Samridhi Realty Group

a) quality

b) cost

c))time

d0 Branding of company

Utilisateur supprimé
par Utilisateur supprimé

The primary priorities at site for execution are scope, time, quality and cost.

More Questions Like This