Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are factors that force you to use precast concrete to construct a building?

user-image
Question ajoutée par Mohamed Sulaiman , Site Project Manager , Al tabarak for Engineering & Contracting company
Date de publication: 2014/01/07
Abdussalam Ghanduri
par Abdussalam Ghanduri , General Manager , AL-MOHANDESS FOR CONSULTANCY

1- Space is not enught for concrete operation and handling.

2- Time factor especialy and cost effectivenes especialy for repetative elements.

3- Requirement for quality tenison memebers as in bridges.

4- Concrete quality control.

Roopesh Jha
par Roopesh Jha , SBU Head - Infrastructures , UB Engineering Limited, New Delhi

There are three basic reasons of precast concrete technology becoming popular in building construction and they are:

1. Time saving

2. Economised construction

3 Better quality and workmanship

 

Ahmad mohamad nossair
par Ahmad mohamad nossair , Senior Bridge Engineer , Systra Arabia

1-complexity of the RC member

2-slenderness of RC member

3-Time needed to execute the structure

4-Repeation of the RC members in order to take the advantages of mass production

hassan amer ali algaifi
par hassan amer ali algaifi , مهندس مشروع , مؤسئسة علي الحصان للمقاولات

the important factors are ;

1. time

2. location of the building

3. the enviroment near the building

 

Kidane Tesfaye
par Kidane Tesfaye , Project manager , GAD CONSTRUCTION PLC

1. If we might have incuntered insuffecient space for mixing.

2.If we need perfectly measured proportion of mixes.

3. If we need to speed up the works more faster than insitu-casting of concrete.

 

olusegun akinmutimi
par olusegun akinmutimi , Field mechanic technician , e-Greq Engineering ( ZERAD)

1. required  wall strenght

2. required slenderness

3.inavailability of working space

4.easy future maintenace on the structural members

Abrar Hussain
par Abrar Hussain , Contract Manager , Sahara Tamiratt

Precast concrete is used in places where Time , Space & working movement is restricted.

Most  commonly it is now being used in Bridges , rail works etc

It may be recommended where

1. spaces are not available for normal form work.

2. space not available for movement of working Labour & Machinery.

3. Short span of time is available to carry out the job.

 

Azhar Bashir
par Azhar Bashir , Senior QA-QC Engineer , Al Arif Contracting Co

Use of Precast concrete in no doubt reduces much time to execute the work including more important advantages of quality control, much higher strengths possible than normal RCC due to which problems arising due to space availability also reduces and it also reduces overall weight of structure.

Wolf Klaas Kinsbergen
par Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

Only the design can force me to do this, otherwise I will always design as well in steel as in prefabricated concrete to let my client se the difference in costs, details, building time. People always talk about costs of a steel frame versus a prefabricated frame, but usually forget to calculate the difference in foundation. This can make the difference!

More Questions Like This