Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
- First fix the scope.
- Check which are activities having Problems.
- Check its connectivity to Critical Path.
- Make a re assessment of the schedule.
- Fix a time period to resolve the problematic items.
-Accommodate these corrective actions in schedule without affecting critical path.