Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What do you think, the major costing part of building project Structural cost or finishing cost?

user-image
Question ajoutée par Rashadul Islam , Senior Executive Engineer , Navana Real Estate Ltd.
Date de publication: 2014/05/06
Rehan Qureshi
par Rehan Qureshi , Financial Consultant , Self Employeed

it is always Finishing cost

Anayatullah Tahir
par Anayatullah Tahir , Finance Manager , Etqan Projects

As mentioned by Mr Rehan Qureshi in his answer it is yes finishing cost more than structural costs. and answer to the question about how much finishing cost is more than structural cost depends on the luxury used in buidlng.

Structural cost is mentioned as (S) and Finishing as (F) Main cost points are:

  • Basement Excavation and foundations (S)
  • Vertical Structure (S)
  • Floor and Roof Structures (S)
  • Exterior cladding (S) (F)
  • Roofing and waterproofing (F)
  • Interior partitions (S) (F)
  • interiof finishes: Floor walls, ceilings (F)
  • Function Equipment and specilties (F)
  • Vertical transportation (elevators) (F)
  • Plumbing (S) (F)
  • Heating, Ventilation and Air conditioning (F)
  • Electrical and Communications (F)
  • Fire protection (F)
  • Site preparation and Demolition (S)
  • Site Development (S)
  • Site utilities (S)

More Questions Like This