Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
In my country of origin, we usually determine the indirect cost to be% -% of the direct cost depending on the size and complexity of the project. Sometimes, if we really wanted to get the project, we meticulously determine the would-be total cost for the project of each of the components or items comprising the indirect cost and add a small percentage for allowance.