A. It is a periodic evaluation of total value of work performed to date. B. It is a periodic evaluation of total cost of the unfinished work. C. It is a periodic evaluati ... Voir Plus
estimating diffculty can be contributed to: A. initial poor scope definition B. lack of required resources. C. insufficent funds. D. problems with the overa ... Voir Plus
a WBS as a tool for the tracking of the: A. the schedule B .assigned resources C. project costs. D. project scope.