Questionnez la Communauté
Ask any professional question and get answers from other specialists.
The cable should be capable to carry maximum demand load continuously. Over-current relay should be used below thermal capability curve and above maximum demand load.
Assuming you have already created a single line diagram in ETAP. Follow the steps below to check the short circuit current values of the system you designed. Follow the s ... Voir Plus
Simulink is a easily available tool to meet your needs if they are very basic. If not, you can try Homer Pro which has all what you need for Solar Modelling.