Questionnez la Communauté
Ask any professional question and get answers from other specialists.
How installing all kinds of RCC structure
All kinds of RCC structures and foundations are cast in the workshop open yards and need to follow up the design and detail drawings including the bar bending
That will depend on the Engine model
At 15000 hrs top end overhauling and 45000 hrs major overhauling
10-15 hours depends on size and sst and other tools availability
if all required conditions are fulfilled it will take 20-30 hr.